{
  "asset": "Assets/Resources/GameArt/FerryCraneYard.png",
  "source": "C:/Users/danie/.codex/generated_images/01a0acd1-fd65-7833-bbb0-c93959eb75c8/exec-7cdb5b0c-2664-41bb-8fa3-055a10ea04d4.png",
  "reference": "Assets/Resources/GameArt/FerryLanding.png",
  "prompt": "Create a NEW original transparent RGBA production architecture sprite for Angel Land Story chapter III, the floating coastal shipyard. Use attached FerryLanding ONLY as painted material/style reference, not a compositional template. Wide 1536x1024 canvas, exact side-on readable 2D platformer architecture, no perspective floor maze. A substantial weathered oak crane-yard on jagged floating slate rock, patinated copper joints, rough grey stone, cream canvas, muted teal pennants, tiny warm work lanterns. Overcast daylight, welcoming craftsmanship before the storm, never black gloomy. Layout: a broad clear ENTRY WALK x30..480 at y850 on sturdy cliff ledge; two small supported step platforms x370..530 at y770 and x470..650 at y690; broad middle WORKING TERRACE x620..1100 at y640, wide enough for a player and a swinging cargo load to pass without narrow blind combat. Tall massive wooden crane above middle terrace, fixed visible suspension eye at x825 y245. NO suspended load yet, leave open air between y260 and y600 for a separate moving cargo prop to be rigged in engine. Crane uprights must be behind the playable walking plane, not a wall across it. At right a high safe open timber LANDING DOCK x1130..1504 at y390, with huge genuine diagonal braces below, low rear rope rail only; keep clear air above dock for a flying ferry. A small round copper tow-ring on a short post at x1390 y320. Entire bottom has a lower permanent RETURN BOARDWALK x350..1410 at y930 supported by visible posts/braces; do not paint ladders because engine adds readable ladders aligned to actual landings. Leave a clear gap x850..1110 between middle terrace and upper dock; no false painted crossing in midair. Jagged rock at left and right, open transparent area below central cantilever, meaningful height changes not repeated columns. Left edge and right edge leave a little transparent margin so adjacent modules can join. No tall tower above upper landing, no huge solid obstacle across flying ferry route. No characters, enemies, boats, text, UI, floating collectibles, waterfalls, rain or lightning. Distinct warm work windows in a small shed behind the left lower path, not a temple arch. Painterly handcrafted AAA storybook illustration, crisp coherent timber grain, believable supports, high detail while preserving clear paths. Full structure in frame on transparent background, all empty gaps transparent. Match reference craftsmanship while changing composition to this crane-yard with the intentional empty moving-load space.",
  "integrated": true,
  "actualPixels": {
    "entry": {
      "left": 28,
      "right": 445,
      "top": 538
    },
    "step": {
      "left": 435,
      "right": 578,
      "top": 514
    },
    "workTerrace": {
      "left": 490,
      "right": 940,
      "top": 445
    },
    "upperDock": {
      "left": 1023,
      "right": 1520,
      "top": 324
    },
    "maintenance": {
      "left": 347,
      "right": 1418,
      "top": 776
    },
    "lowerStep": {
      "left": 370,
      "right": 540,
      "top": 599
    },
    "craneEye": {
      "x": 943,
      "y": 110
    },
    "towRing": {
      "x": 1345,
      "y": 250
    },
    "note": "Initial visual registration of actual generated image, not requested coordinates. Side steps partly BELOW entry. Use .024 m/px with entry y538 aligned to existing upper landing y3.102; first left edge global16.324 gives origin34.084. High dock y8.238, crane eye y13.374. Measure edges before implementation; no invisible supports."
  },
  "sha256": "2b7ac248ee7539c3e32187020579db3188c62d88054d3e0b75d0d3f5b557f3ab",
  "implementation": "Crane yard origin34.084, .024m/px, entryy3.102, upper8.238. Physical restrained cargo, real timed jump onto inclined light thread; permanent return ladders. Existing ferry has three stops and high18m multipoint route over tower/crane; final hull center54.4 outside right cliff52.132."
}
